# Reading the widgets

What each widget on the Repairs overview counts, and the traps in comparing one against another.

Nine widgets ship on the default board. Each answers a different question, and two of them count something other than tickets, which is the thing most worth knowing before you read a figure aloud in a meeting.

## The four counts across the top

![Four stat cards side by side. Total Tickets reads 22 with a small calendar picker, a green gauge reading 22 This Month, and three chips: 1 Rush, 41 per cent Completed, and plus 100 per cent vs last month. Active Repairs reads 56 with a Live badge and a blue gauge reading 85 per cent of open work, above chips reading 10 Pending, 2 Rush and 22 Overdue. Ready for Pickup reads 28 with a Live badge and a gauge reading 29 per cent on time, above chips reading 20 Overdue and 8 On time. Total Revenue reads 58.5 thousand pounds with a calendar picker and a rising arrow, above chips reading 24.8 thousand Collected, 33.8 thousand Pending and plus 557 per cent vs last month.](https://www.sorviai.com/help/repairs/overview/stat-cards.png)

*Two cards carry a calendar picker and two carry a Live badge. That difference decides what they are counting.*

*The four stat cards*

> **Warning:**
>
> **A live card can be larger than the period card beside it**
>
> Active Repairs reading 56 next to Total Tickets reading 22 is not a contradiction. The first counts open work regardless of when it arrived; the second counts what came in during the chosen window. The **Live** badge is the tell: a card carrying it is not scoped to the period at all.

## The charts

- **Ticket Trend (30d)**: Daily ticket volume across the last thirty days, with the period total called out above the chart. Read it for shape rather than for exact counts: a dip on a Sunday is not a problem.
- **Top Repair Services**: Which faults you see most, as a share of the work. The number in the middle of the ring is a count of line items, not of tickets.
- **Status Breakdown**: Where the work is sitting, by status. Also counted in line items, and the fastest way to see that a third of the workshop is waiting on parts.

## The lists below the fold

![The lower half of the Repairs Overview. Top Technicians lists Priya Raithatha with 6 tickets and 10.3 thousand pounds, Sian Pritchard with 5 and 8.2 thousand, Callum Aitken with 4 and 11.4 thousand, and Nadia Osei with 3 and 12.0 thousand. Recent Tickets lists RPT-00007 Gate valve reseating and certification, Repaired, 2.8 thousand pounds, Today; RPT-00010 Compressor air-end inspection, Waiting for Parts, 3.8 thousand, Today; RPT-00029 Centrifugal pump refurbishment, Pending, 4.5 thousand, 1 day ago; and RPT-00018 Three-phase motor rewind, Repaired and Collected, 5.2 thousand, 1 day ago. Status Breakdown is a doughnut headed TOTAL ITEMS 37, listing Waiting for Parts 11 at 30 per cent, Repaired and Collected 7 at 19 per cent, Unlocked 6 at 16 per cent, Pending 5 at 14 per cent, Repaired 2 at 5 per cent and Cancelled 2 at 5 per cent.](https://www.sorviai.com/help/repairs/overview/dashboard-lower.png)

*Three lists. Top Technicians is ordered by tickets handled, which is not the same as ordering by revenue.*

*What each list is for*

| Widget | What it answers |
| --- | --- |
| Top Technicians | Who handled how many jobs, and what those jobs were worth |
| Recent Tickets | What has come in lately, with its status and its value |
| Status Breakdown | Where the work is stuck, as a share of everything open |

> **Tip:**
>
> **Most tickets is not most revenue**
>
> Look at the technician list above: the person at the top handled twice as many jobs as the person at the bottom, and billed less. The list orders by ticket count, so read the revenue column separately rather than treating the order as a ranking of value.

> **Note:**
>
> **The two doughnuts count line items, not tickets**
>
> Both rings read 37 while Total Tickets reads 22, because one ticket can carry several repairs and each is counted separately. That is the right way to count faults and statuses, since a job with two repairs finished and one waiting is genuinely in two states. Just do not put the two numbers in the same sentence without saying which is which.
